Asset Commissioning Log Template

Document how each new asset was installed and brought into service. This template helps maintenance, facilities, and project teams record installation, testing, and sign-off for new equipment. Each commissioning record keeps the serial number, initial readings, test result, and punch list together from day one.

Use Template
Riverside Ops
Commissioning
Assets
Locations
Vendors
Asset Commissioning Log6 scheduled this month · 1 on hold MRJLTKCalendar ViewNew card
AskSearchFilterSort
MON16
Chiller CH-2CompletedTK
TUE17
Boiler B-3In ProgressJL
Walk-in freezerScheduledMR
WED18
Generator G-5On HoldTK
THU19
Air handler AHU-4ScheduledRO
Dish machineScheduledAS
FRI20
Fire pump FP-1ScheduledTK

How the Asset Commissioning Log Workflow Works

Schedule commissioning

Create a record with the Asset, Location, Supplier / Installer, Purchase Order #, and Serial Number, and set the Status to Scheduled.

Boiler B-3Scheduled
LocationCentral Plant
InstallerFerguson Mechanical
Purchase Order #PO-2311
Serial NumberBX-40019-22

Install and test

Record the Installation Date, Initial Meter Reading, and Test Result (Pass, Conditional Pass, or Fail), and list open items in Punch List Items.

Boiler B-3In Progress
Installation DateMar 17, 2026
Initial Reading0 hrs
Test ResultConditional Pass
Punch ListRelabel gas shutoff · add flue cap

Sign off

Record the Commission Date, Warranty Start Date, Commissioned By, and Approved By, then mark the record Completed.

Chiller CH-2Completed
Commission DateMar 16, 2026
Warranty StartMar 16, 2026
Commissioned ByTKTomas Kane
Approved ByDCDana Cole

Benefits of This Asset Commissioning Log Workflow

  • A clean starting record for every asset

    Serial numbers, initial readings, and warranty start dates are captured when equipment enters service.

  • Open items are not forgotten

    Punch List Items and the On Hold and Failed statuses keep incomplete installs visible.

  • Clear accountability

    Commissioned By and Approved By show who did the work and who signed off.

What’s Included in This Workflow

Commissioning records

One card per asset commissioning, with 17 fields covering installation, testing, warranty, and sign-off.

  • Serial Number
  • Initial Meter Reading
  • Test Result
  • Punch List Items

Status and test tracking

Status options for Scheduled, In Progress, Completed, On Hold, and Failed, plus a separate Test Result field.

  • Scheduled
  • In Progress
  • Completed
  • On Hold
  • Failed

Board, list, and calendar views

A Status Board, an All Commissioning Records list, and a Calendar View by Commission Date.

  • Status Board
  • All Records
  • Calendar View

Customize the Workflow for Your Team

Add fields for your equipment types, such as startup pressures or electrical readings. Connect the Asset, Location, and Supplier / Installer fields to your existing Assets, Locations, and Vendors workspaces. Coast AI can turn the punch list into a checklist, set the status from the test result, or create the first preventive maintenance schedule when commissioning is completed.

Use Template

FAQs About Asset Commissioning Log

What happens when I add this workflow to Coast?

Coast creates an Asset Commissioning Log workspace with installation, testing, and sign-off fields, Status options from Scheduled to Completed, and board, list, and calendar views.

How can Coast AI help with this workflow?

Coast AI can add fields and checklists, set up automations, and answer questions such as which installs are on hold or which assets failed initial testing.

Can I track commissioning for a large project?

Yes. Create one record per asset and use the Calendar View and Status Board to follow progress across the project.

Can I import existing commissioning records?

Yes. Import records from a spreadsheet, or ask Coast AI to help map your columns.

Use Template